Code Stories · why the rule exists

Cleanouts: Spacing and Changes of Direction

The rule in Massachusetts today

Verbatim, 10.08(3)(d): "Accessible cleanouts shall be installed: 1. at each change of direction of the building drain; or 2. at each change of direction of horizontal waste or soil lines and branch lines, that are greater than 45 degrees." 10.08(3)(j): "Cleanouts shall be of the same nominal size as the pipes up to four inches and not less than four inches for larger piping." 10.08(3)(k)1: "Cleanouts on three inch or larger pipes shall be so installed that there is a clearance of not less than 18 inches"; 2: smaller than three inches, "a 12-inch clearance."

248 CMR 10.08(3)(a), (d), (f), (j), (k), (l), (m) · confirm in the current 248 CMR

Why it exists

Every drain eventually clogs, and a cleanout is the planned way to reach the clog without cutting pipe. Blockages tend to form where the flow slows or changes direction. A cable or snake can only go so far and loses force at each bend, so both distance and bends are limited between access points. Making the cleanout the same size as the pipe, up to a point, lets a full-size tool pass.

How it came to be

  1. 1940 — BMS 66 section 508 requires cleanouts at the foot of each stack and at direction changes greater than 45 degrees. archive.org
  2. 1940 — BMS 66 sets a spacing limit. archive.org
  3. 1940 — BMS 66 counts a bolted fixture connection as a cleanout. archive.org

Make it stick

Mnemonic: 'Every bend is a place to get stuck, so give the snake a door.' MA version: a door at the base of every stack, at every turn of the building drain, at turns over 45 degrees on branches, and at least every 50 ft (4 in. and smaller) or 100 ft (over 4 in.).

On the exam

Expect MA spacing (50 ft for 4 in. and smaller, 100 ft for larger), when a change of direction requires a cleanout (every change on the building drain; more than 45 degrees on horizontal waste, soil and branch lines), the base-of-stack cleanout, cleanout size (same as the pipe up to 4 in., not less than 4 in. above that), clearance (18 in. for 3 in. and larger, 12 in. for smaller), the building-drain cleanout at the foundation wall, the outside cleanout within 5 ft of the foundation wall for slabs and shallow crawl spaces, and MA's cleanout equivalents (10.08(3)(m)): a fixture trap with a union connection, a fixture with an integral trap, or a readily removable roof-drain cover.

What people get wrong

Try it: 3 real practice questions

Q1. On waste, soil and branch lines, a cleanout is required at each change of direction greater than:

Q2. On horizontal drainage piping 4 inches in diameter or smaller, cleanouts must be spaced no more than:

Q3. A cleanout is required at what location on every drainage stack?

These come from the PressureTest bank. Start 7 days free for the full bank, timed exam simulations and drawn isometric problems.

Teaching this? Present it in class · Assign it to your class

Sources

History is presented as history. The current Massachusetts rule is the box at the top — use it on the exam.